Afloat
Ship-to-Ship Transfers
Two ships, a line of fenders and a mooring master — the most exacting thing we do.
Ship-to-ship is how a VLCC parcel becomes four MR parcels without a terminal. It is also where two moving steel objects are brought alongside each other on open water, so it is run to a written plan and nothing else.
Mooring master aboard, fenders deployed and checked, the transfer plan agreed and signed by both masters before the first line goes across.
The weather limit is written before the approach
Wind, swell and current limits are set in the transfer plan with the numbers in them. When the limit is reached the transfer stops, whatever it costs.
A limit decided during the operation is not a limit.
What we check, every time
- Transfer plan agreed and signed by both masters.
- Fenders sized, deployed and inspected.
- Hoses pressure-tested and in date.
- Weather limits written with numbers, and enforced.
- Emergency release and unmooring plan briefed.

This is only the start
Bunkering
Bunker supply at berth and at anchorage, with joint gauging and MARPOL sampling.
Marine assurance
Vessel vetting and marine assurance: inspection history, terminal compatibility and the ship-shore safety checklist.
Port agency
Port agency and husbandry: clearance, stores, crew changes and the disbursement account.

Talk to the desk
Tell us the product, the volume, the dates and the route. We will tell you what we can do, and what we cannot.