
Ashore
Bitumen & Heavy Fuel Oil
The hot end of the terminal. Heat it too little and it will not move; too much and you have ruined it.
Heavy grades are stored hot, and the temperature is part of the specification rather than a convenience. Bitumen held too cool will not pump; held too hot for too long it hardens and the penetration value drifts out of grade.
Our heated tanks are insulated, coil-heated and logged. The temperature chart travels with the cargo.
Heating and conditioning
Coils are inspected and pressure-tested on a programme, because a leaking steam coil puts water into a cargo that must not have any.
Where a tank has stood, we circulate before we load out rather than drawing from a stratified tank and discovering the difference at the receiving end.
Compatibility of fuel blends
Two stable fuel oils can make one unstable blend. Where a commingled receipt is proposed we run a compatibility check first, and we decline the receipt if it fails.
At a glance
| Grade | Held at | Watch |
|---|---|---|
| Bitumen 70/100 | 150–170 °C | Penetration drift, skin formation |
| Bitumen 160/220 | 140–160 °C | As above, softer grade |
| HSFO 380 cSt | 45–55 °C | Sludge, compatibility with other fuels |
| VLSFO 0.5% | 40–50 °C | Stability, wax, blend compatibility |
| Marine gasoil | Ambient | Cloud point in winter |
What we check, every time
- Coil integrity tested on programme and after any water finding.
- Temperature logged continuously and the chart issued with the cargo.
- Circulation before load-out where the tank has stood.
- Compatibility spot test before any heavy-fuel commingling.

This is only the start
Bunkering
Bunker supply at berth and at anchorage, with joint gauging and MARPOL sampling.
Road, rail & pipeline
Bottom loading for road tankers, rail gantries for tank wagons, and pipeline connections at the terminal boundary.
Quality & sampling
Sampling and testing to recognised practice, with retained samples held ninety days after every transfer.

Tell us what needs holding
Tell us the product, the volume, the dates and the route. We will tell you what we can do, and what we cannot.
