Ashore
LPG & Pressurised Gases
Pressure vessels, relief systems and a deluge main — the part of the terminal with the strictest rules.
LPG is stored under pressure or under refrigeration, and either way the containment is the safety system. Horizontal bullets on saddles, mounded vessels, relief valves set and tested, a fire-water deluge over the whole bank and gas detection that trips the transfer.
This is the part of a terminal where procedure is not paperwork. Nothing moves without a permit and a second pair of eyes.
Permits and isolation
Every transfer runs on a written permit that names the vessel, the line, the valves and the person who checked them. Isolation is physical, not a closed valve on a drawing.
We stop transfers for weather, for a gas alarm, and for anything that looks wrong, and we do not apologise for it.
At a glance
| Product | Stored | Notes |
|---|---|---|
| Propane | Pressurised or refrigerated | Higher vapour pressure; winter grade |
| Butane | Pressurised | Blending component for gasoline |
| LPG mix | Pressurised | Composition agreed and sampled |
| Isobutane | Pressurised | Dedicated, petrochemical feed |
What we check, every time
- Relief valves in date and certified.
- Gas detection tested and the trip proven, not just the alarm.
- Deluge tested on programme and after any modification.
- Permit issued, isolation witnessed, two people present.

This is only the start
Health & safety
Health, safety, security and environmental management at Senlim terminals: permits, fire protection and competence.
Road, rail & pipeline
Bottom loading for road tankers, rail gantries for tank wagons, and pipeline connections at the terminal boundary.
Tanker shipping
Deep-sea tanker shipping: fixing, operating and reporting voyages from MR to VLCC.

Tell us what needs holding
Tell us the product, the volume, the dates and the route. We will tell you what we can do, and what we cannot.