Deep-sea tonnage against a cargo, fixed on the cargo rather than on the freight rate alone.

A deep-sea fixture is a set of compromises: the vessel that is cheapest is rarely the one with the right coating, the right number of segregations or a draft the discharge berth can take.

We fix on the cargo and the berths at both ends, operate the voyage ourselves, and report each stage as it happens rather than when you ask.

MR–VLCC
Classes fixed
25,000 to 320,000 dwt
ASBATANKVOY
Usual form
Or the charterer’s own
A → Z
Waypoints
Reported as each completes

What we check before we fix

Vetting status, last three cargoes, coating condition, segregation count, pumping rate and whether the vessel has actually called at your discharge berth before.

A vessel that fails our check is not offered to you with a caveat. It is not offered.

  • Vetting and inspection history current.
  • Coating suitable for the grade.
  • Enough segregations for the parcels.
  • Draft and length inside both berths.
  • Pumping rate against the laytime allowed.

Laytime and demurrage, explained before it bites

Laytime starts when notice of readiness is validly tendered and the clock runs on the terms in the charter party, not on what feels fair.

We keep the statement of facts as the voyage runs so the timesheet is agreed at discharge rather than argued six weeks later.

A timesheet agreed on the day is worth more than a claim won in a year.

At a glance

ClassDeadweightWhere it fits
VLCC200,000–320,000 tLong-haul crude, deepwater terminals only
Suezmax120,000–200,000 tCrude, Suez-transitable
Aframax80,000–120,000 tCrude and dirty products, flexible berths
LR1 / Panamax55,000–80,000 tLong-haul clean products
MR25,000–55,000 tThe workhorse of the clean trade
Handysize10,000–25,000 tSmaller parcels, restricted berths

What we check, every time

  • Vetting current and the inspection report read, not just the date.
  • Coating and previous cargoes checked against your grade.
  • Both berths confirmed for draft, length and manifold height.
  • Notice of readiness tendered in the form the charter party requires.
  • Statement of facts kept as the voyage runs.